The average ORDC adder for 2022 equaled $6.33 per megawatt hour, which is more than 12 times higher that the average adder for 2021, excluding that associated with Winter Storm Uri. ________________________________________________ An ERCOT-administered system that...
The settlement calls for the Waco-base cooperative to promptly repay $600 million it owes ERCOT, and to repay various ERCOT market participants over time ________________________________________________ Brazos Electric potentially would repay the entirety of its $1.9...
Oncor credits a $60 million revenue increase for the quarter to higher transmission and distribution rates and other factors. ________________________________________________ Oncor Electric has reported net income of $318 million during the three months ending...
SB 1281 directs the PUC to consider congestion cost savings when approving transmission line construction. ________________________________________________ Senate Bill 1281 — adopted last year by the Texas Legislature — includes various energy-related provisions, but...
Facing the prospect of having their role at ERCOT significantly cut, stakeholder groups appear united in their opposition to the proposed changes. ________________________________________________ Stakeholders would have their supervisory authority over ERCOT...
The proposal attracted opposition from a variety of public and private officials during a September 13 joint hearing. ________________________________________________ A proposal to shore up the grid reliability through the creation of an ERCOT “gas desk” has received...